Feeds:
Posts
Comments

Archive for the ‘renewable energy’ Category

ausra-kimberlina

photo: Ausra

In my new Green State column on Grist, I sit down with legendary Silicon Valley venture capitalist Vinod Khosla to talk about his approach to green tech. Khosla — who raised a record $1.1 billion for green tech investing earlier this month — believes that unless a technology can scale and be adopted in markets like China and India, it will not have a meaningful impact on climate change.

Getting an audience with Silicon Valley’s guru of green investing isn’t always easy.

If Vinod Khosla is not speaking at one of the innumerable, and apparently recession-proof, green business conferences that seem to happen every other week, he’s giving lectures at Google headquarters, writing white papers, or, of course, inking checks to green tech startups with the potential to disrupt multi trillion-dollar global industries like energy, automobiles and building materials.

He’s something of a Valley legend:  Co-founder of Sun Microsystems, then a longtime tech investor with marquee venture capital firm Kleiner Perkins Caufield & Byers and now head of Khosla Ventures, which he started in 2004 to invest in green tech startups.

Khosla and his partners had been investing their own money, but earlier this month the firm announced it had raised $1.1 billion for two funds—one of which is the largest first-time fund in a decade. It was a rather staggering amount, given that clean-tech investing has plummeted from $4 billion in 2008 to $513 million so far this year, according to PricewaterhouseCoopers, as the “Great Recession” continues to take its toll.  Putting money into the two Khosla funds was the nation’s largest pension fund, the California Public Employees’ Retirement System.

It’s not the size of Khosla’s fund but what he intends to do with it that should command your attention. In short, he wants to take the green out of green investing and globalize the bottom line.

You can read the rest of the column here.

Read Full Post »

esolar_8
photo: eSolar

In Sunday’s Los Angeles Times, I write about how the rise of green technology is changing the way Silicon Valley venture capitalists do business:

Silicon Valley venture capitalists have always been about inventing the future — taking a wild idea, nurturing it with cash and creativity and giving birth to new products, companies and industries we once couldn’t imagine and now can’t conceive of living without: the Web, Google, the iPhone, Twitter.

But as green technology becomes the latest tech wave to break from the nation’s entrepreneurial epicenter, it’s now all about companies reinventing the past. Solar power companies, electric car start-ups and algae biofuel ventures aim to remake century-old trillion-dollar industries on a global scale.

Venture capitalists poured $4 billion into green-tech start-ups in 2008 — nearly 40% of all tech investments in the U.S., according to a survey by PricewaterhouseCoopers. Green-tech investment plunged in the first half of 2009 to $513 million as the recession dragged on, but there are signs of a rebound: Silicon Valley’s Khosla Ventures announced this month that it had raised $1.1 billion — the biggest first-time fund in a decade — that would be largely devoted to investing in green-tech start-ups, many in Southern California.

But green-tech companies face unique challenges, including global markets, tough technological hurdles and a future shaped by government incentives and regulatory policy. Those challenges are changing the game on Sand Hill Road.

“If you’re starting a Web 2.0 company, your basic needs are personnel and servers — there is no physical product, no manufacturing capacity, no inventory, no steel in the ground,” VantagePoint’s Salzman said, referring to software-based companies that provide services over the Internet.

Green-tech start-ups, he said, often need big money and investors steeped in big science and big government.

You can read the rest of the story here.

Read Full Post »

first solar

Photo: First Solar

First Solar became the first U.S. solar company to break into the Chinese market on Tuesday and it did do in a big way when it signed an agreement to build a two-gigawatt thin-film solar power plant in Inner Mongolia. As I write in The New York Times:

Chinese government officials signed an agreement on Tuesday with First Solar, an American solar developer, for a 2,000-megawatt photovoltaic farm to be built in the Mongolian desert.

Set for completion in 2019, the First Solar project represents the world’s biggest photovoltaic power plant project to date, and is part of an 11,950-megawatt renewable-energy park planned for Ordos City in Inner Mongolia.

The memorandum of understanding between Chinese officials and First Solar, the world’s largest photovoltaic cell manufacturer, would open a potentially vast solar market in China and follows the Chinese government’s recent moves to accelerate development of renewable energy.

You can read the rest of the story here.

Read Full Post »

solarcells

photo: Southern California Edison

It hasn’t received much media attention, but the California Public Utilities Commission has just proposed instituting a first-of-its-kind reverse auction market to spur renewable energy development — mainly solar photovoltaic.  As I write today in The New York Times:

California regulators are taking an eBay approach to ramping-up renewable energy in the Golden State.

In what might be a world first, the California Public Utilities Commission on Thursday proposed letting developers bid on contracts to install green energy projects. A solar company that offers to sell electricity to one of California’s three big utilities at a rate lower than its competitors would win a particular power purchase agreement.

This “reverse auction market” feed-in tariff is designed to avoid the pitfalls the have plagued efforts in Europe to encourage development of renewable energy by paying artificially high rates for electricity produced by solar power plants or rooftop photovoltaic projects.

You can read the rest of the story here:

Read Full Post »

solara

photo: BrightSource Energy

Chevron and solar developer BrightSource Energy have revealed a deal for a solar steam plant that is being built in an oil field in California. As I wrote in The New York Times this week:

BrightSource Energy has broken ground on a 29-megawatt solar steam plant at a Chevron oil field in Coalinga, Calif.

The 100-acre project’s 7,000 mirrors will focus sunlight on a water-filled boiler that sits atop a 323-foot tower to produce hot, high-pressure steam.

In a conventional solar power plant, the steam drives a turbine to generate electricity. In this case, the steam will be injected into oil wells to enhance production by heating thick petroleum so it flows more freely. Oil companies typically rely on steam generated by natural gas or other fossil fuels to maximize oil recovery in places like the oil patch in California’s Fresno and Kern counties, where the petroleum is heavy and gooey.

You can read the rest of the story here:

Read Full Post »

solarF

In Monday’s New York Times’ Green Inc. blog, I take a look at two recently approved solar energy contracts in California that offer a rare look at the economics of large-scale solar power plants:

California regulators have approved contracts for more than 8,600 megawatts of renewable energy, to be generated mostly by big solar power plants for the state’s largest utilities. But the details of those deals and the emerging economics of green energy often remain shrouded in secrecy, subject to confidentiality agreements.

That black box cracked open a bit on Thursday, when the California Public Utilities Commission gave the green light to two 25-year power purchase agreements between Pacific Gas & Electric and BrightSource Energy, a solar power plant builder based in Oakland, Calif.

When approving contracts for 310 megawatts of solar electricity, the utilities commission also signed off on an apparently first-of-its-kind technology royalty agreement between BrightSource and PG&E.

You can read the rest of the story here.

Read Full Post »

eSolar Sierra

photo: eSolar

The U.S. Department of Energy on Friday began accepting applications for at least $3 billion in direct funding of renewable energy power plant projects.

The funding, part of the federal stimulus package, is in lieu of a 30 percent investment tax credit that green energy developers can take on their projects. Given that most solar and wind developers carry no tax liabilities, they have relied on investment banks and other investors to front the hundreds of millions and billions of dollars in financing needed for their projects in exchange for the tax credits. But as the economy tanked along with investment banks, demand for so-called tax equity partnerships evaporated.  Big Solar projects stalled and wind developers delayed turbine orders.

Curiously, the Department of Energy said on Friday that the $3 billion would fund some 5,000 projects. That works out to about $600,000 per power plant. But a single 250-megawatt solar power plant alone can cost more than a $1 billion and would thus soak up $300 million or 10% of the funding pool.

The question is, will DOE end up funding a few large-scale green energy projects that could start to give, say, the solar thermal industry economies of scale, or will it spend the money on hundreds of smaller renewable energy facilities?

That’s a crucial issue for solar developers like Tessera Solar/Stirling Energy Systems, eSolar and BrightSource Energy, which is backed Google (GOOG), Morgan Stanley (MS) and VantagePoint Venture Partners as well as a clutch of oil giants – Chevron (CVX), BP (BP) and Norway’s StatoilHydro.

Also left unsaid in the DOE’s announcement was the fact that renewable energy projects need to break ground by the end of 2010 to qualify for the direct funding. Which is why BrightSource, Nextera Energy (a subsidiary of utility giant FPL Group (FPL) ) and Tessera Solar are eager to expedite the lengthy California licensing process and get their projects approved before New Year’s Eve 2010 so they can put shovel to dirt and start shoveling cash into their coffers.

Read Full Post »

Stirling SunCatcher

photo: Tessera Solar

When it comes to renewable energy, Texas has been all about Big Wind. But this week the Lone Star State took on its first Big Solar project when San Antonio utility CPS Energy signed a 27-megawatt deal with Tessera Solar.

Houston-based Tessera is the solar farm developer for Stirling Energy Systems, which makes a Stirling solar dish. Resembling a giant mirrored satellite receiver, the 25-kilowatt solar dish focuses the sun’s rays on a Stirling engine, heating hydrogen gas to drive pistons that generate electricity. (Last year Irish green energy firm NTR pumped $100 million into Scottsdale, Ariz.-based Stirling Energy Systems and created Tessera to develop solar power plants using the Stirling dish, called the SunCatcher.

Stirling Energy Systems previously signed deals with Southern California Edison (EIX) and San Diego Gas & Electric (SRE) to supply up to 1,750 megawatts of electricity from some 70,000 solar dishes to be planted in the Mojave and Sonoran deserts.

Other solar developers privately have cast doubt on Stirling’s ability to make good on those contracts, arguing the SunCatcher is just too expensive and complex to compete against solar thermal technologies that rely on mirrors to heat liquids to create steam that drives electricity-generating turbines.

But earlier this week, Stirling unveiled the latest generation of the SunCatcher at Sandia National Laboratories in Albuquerque, N.M. The new SunCatcher has shed 5,000 pounds and its Stirling hydrogen engine contains 60% fewer parts than the previous version, according to the company.

The SunCatcher also uses a fraction of the water consumed by competing solar thermal technologies being developed by startups like BrightSource Energy and Ausra — no small deal in the desert. Tessera solar farms also can be built in modules, meaning that when a 1.5 megawatt pod of 60 SunCatchers is installed it can immediately begin generating electricity — and cash.

California utility PG&E also went modular Thursday when it signed a 92-megawatt deal with New Jersey’s NRG (NRG) for electricity to be generated by a Southern California solar power plant using eSolar’s technology. Google-backed (GOOG) eSolar’s builds its solar power tower plants in 46-megawatt modules. The power plants take up much less land than competing solar thermal technologies, thanks to eSolar’s use of sophisticated software to control small mirrors that are packed close together.

NRG earlier this month signed a deal to build a 92-megawatt eSolar-powered solar farm in New Mexico near the Texas border.

eSolar CEO Bill Gross says his solar farms will generate electricity cheaper than natural gas-fired power plants, a claim PG&E (PCG) appears to confirm in its submission of the deal to the regulators. (Thanks to Vote Solar for pointing to the document.)

Read Full Post »

Stirling Energy Systems Solar One project

image: URS

Green Wombat spent several months looking into allegations that California labor unions are using environmental laws to pressure  solar developers to hire union workers to build large-scale solar power plants. The story was published last Friday in The New York Times:

SACRAMENTO — When a company called Ausra filed plans for a big solar power plant in California, it was deluged with demands from a union group that it study the effect on creatures like the short-nosed kangaroo rat and the ferruginous hawk.

By contrast, when a competitor, BrightSource Energy, filed plans for an even bigger solar plant that would affect the imperiled desert tortoise, the same union group, California Unions for Reliable Energy, raised no complaint. Instead, it urged regulators to approve the project as quickly as possible.

One big difference between the projects? Ausra had rejected demands that it use only union workers to build its solar farm, while BrightSource pledged to hire labor-friendly contractors.

As California moves to license dozens of huge solar power plants to meet the state’s renewable energy goals, some developers contend they are being pressured to sign agreements pledging to use union labor. If they refuse, they say, they can count on the union group to demand costly environmental studies and deliver hostile testimony at public hearings.

If they commit at the outset to use union labor, they say, the environmental objections never materialize.

You can read the rest of the story here.

Read Full Post »

eSolar Sierra
photo: eSolar

California may be in the midst of licensing dozens of massive megawatt solar power plants but New Mexico may be first state out of the gate with a big project using next-generation solar thermal technology. On Thursday, New Mexico Governor Bill Richardson announced that Pasadena, Calif.-based eSolar and utility giant NRG Energy will build a 92-megawatt solar thermal power plant — the state’s first — near the Texas border that will go online in 2011.

“The New Mexico Public Utilities Commission has approved the project, we have the permits and  we already have the land so we’ll be breaking ground in 2010,” eSolar CEO Bill Gross told Green Wombat. “We already have the equipment and the financing partner, NRG. We’re ready to go.”

In February, Google-backed (GOOG) eSolar agreed to supply its technology to NRG (NRG) to develop solar farms generating 500 megawatts.

eSolar will use fields of mirrors to focus the sun on water-filled boilers that sit atop towers. The heat vaporizes the water and the resulting steam drives electricity-generating turbines. Competitors use large, slightly curved — parabolic — mirrors to focus sunlight. That requires big and expensive steel frames to hold the glass in place.  eSolar’s solution: make small flat mirrors the size of an LCD television screen that clamp on to a  5 x 12-inch frame and then use software and Big Iron computing to position the mirrors to create a “dynamic parabola” out of the entire heliostat field.  Gross says eSolar’s small heliostats can be cheaply manufactured take up less land than conventional mirrors.

That means eSolar can build modular power plants near urban areas and transmission lines, lowering costs and avoiding some of the endangered species fights that have slowed Big Solar projects in California. (See Green Wombat’s column on Grist for a first-hand look at eSolar’s Sierra demonstration plant in Southern California.)

The New Mexico solar farm will be built on 450 acres of agricultural land about 10 miles from El Paso, Texas. Utility El Paso Electric (EE), which serves parts of New Mexico, will buy the electricity generated by the solar power plant — enough to power 74,000 homes  — under a 20-year power purchase agreement. Terms of the deal were not disclosed.

“We think there’s room for a lot more solar power plants at this price,” says Gross. “The sun is very good in New Mexico and all the economics that make this project work are very good there.”

In March, First Solar (FSLR) said it would build a 30-megawatt thin-film photovoltaic solar farm in northeastern New Mexico.

eSolar’s five-megawatt Sierra demo plant outside Los Angeles, pictured above, has begun producing steam and will soon start generating electricity — “It’s the only solar power tower operating in North America,” Gross says.

Next year, ground will be broken on an eSolar power plant in India and NRG and eSolar have a deal to supply utility Southern California Edison (EIX) with 245 megawatts of solar electricity.

“The idea of these plants dotting the desert and producing electricity has been our dream for a long time,” says Gross, “and now it’s a reality.”

Read Full Post »

« Newer Posts - Older Posts »

Design a site like this with WordPress.com
Get started